Top 30 Sap Qm Interview Questions You Must Prepare 27.Jul.2024

Q1. Which Movement Types Refer To Inspection Origin 05?

You need to check the T156S-QSSHK. It shows the inspection lot origin for all movement types.

Q2. I Want To Post The Stock From Quality Inspection To Unrestricted Use Partially With Two Ud Codes For Same Inspection Lot. But The Qga2 System Will Show The Total Document Posted On Only One Usage Deci

You could use inspection points and partial lots. In this way, you may have a different UD for inspection points and inventory posting accordingly.

Q3. I Need Some Guidelines In Maintaining The Settings For Batch Management In Qm. What Are The Customizations Necessary For Batch Management From Qm Point Of View? How The Inspection Lots Get Triggered

The links have to do with your configuration of batch management for your material. If the materials in question are batch managed and are purchased or manufactured within your organization when the material is received using the 101 movement type, the batch is created and assigned in the background to the inspection lot.

Depending on how you've designed your inspection plan or material specification, you can build the master inspection characteristics, dependent on class characteristics, that will copy the inspection results into the batch record.

This is less QM configuration than it is MM-Batch Management configuration and material master definition.

Q4. I Know It Should Be Possible To Attach Files, Pictures Etc. When Creating Notifications. However, I Am Working Right Know In An Automotive Release And Cannot Find The Button Anymore. Did We Miss Somet

Check what type of user you have set up. Sometimes the security guys set up a testing ID as a different type than a regular user. Some ID types don't have the ability to use the Object services functionality.

Q5. In The Inspection Plan I Have A Characteristic With Upper Limit. In Which Table Can I Find This Value?

Look at table PLMK. If it is a reference MIC, also check QPMK. These are for checking the plan. The Inspection Lot keeps them in different values.

Q6. I Am Having 3 Different Operations. The 0020 And 0030 Operation Is Dependent On The 0010 Operation. It Means That Once The Rr Is Done For Operation 0010, Manual Ud Has To Be Taken Immediately. Then Re

You could use Inspection Points for 0010 (it has its own UD) and then use the Inspection Lot UD for the whole process.

Q7. How Do I Use Material Specification? If I Want To Use Material Specification, What Are The Things I Should Do?

To use Material specification you need to have:

  1. Class Characteristics;
  2. MIC's linked to the Class Characteristics;
  3. A Class containing the Class Characteristics, assigned to the Material Master;
  4. Material spec maintained. (QS61);
  5. Limit values for the characteristics, maintained in the classification view in the material master;
  6. Inspection with material specification chosen in the inspection type in the material master.

Q8. I Want The System To Take My User Name As Default For Partner Ao Author While Creating A Notification. I've Created The Partner Determination Profile And Assigned It To The Notification But It Is Not

I assume that you have an organization for the partners. I think you need to utilize workflow and do some coding.

Utilize the user ids. Use the KU for coordinator since it is for the user, and KO is for the person which requires HR. When a Q3 based notification is created the coordinator would be defaulted. But as I said, it requires organization, workflow and some coding.

Q9. I Have Activated 04 Inspection Type With Post To Inspection Stock For A Material. I Have Left Qm Not Active Unchecked For 101 Mvt Type For Mvt Indicator F (gr For Order) In Omjj. While I Am Doing Gr

If the process order was created after you modified the material, then it's an "old" process order, and this may explain the error. If there was an existing stock of this material before you start, then try this first with a newly created material. Afterwards, the error you describe should not happen.

Q10. I Have Created Some Certificate Profiles That Need To Be Deleted. But They Are All In Released Status. I Know That Certificate Profile Cannot Be Deleted If It Is In "rel" Status. How I Should Deal Wit

It seems to me you could potentially block the profile - from within the profile, edit -> block profile. Once it's blocked, you can proceed with the deletion.

Q11. Is It Possible To Make The Inspection Lot Quantity To (1) All The Time? Can It Be Configured As An Automatic Default In Qa01? If Yes, What Are The Steps Necessary To Make A Sample Size Default Every T

If you are referring to the Sample Size the answer is yes.

If you are referring to the Lot Size, then the answer is no.

For the lot quantity, you can use a sampling procedure of type fixed and assign the size to 1.

Q12. Where Does The System Store Mic Long Text History? When I Tried Using, 'read_text Function Module', The System Is Fetching Only New Long Text. How Do I Fetch The Old Long Text Of Mic?

The system does not store the long text history, because it is a text. To maintain the long text, create MIC with the appropriate versions and assign MIC in the task list as per the required version. The setting is in customization for the plant level, MIC with history.

An alternative recourse is to check out AUT1@You need to set it up, but it allows you track changes to any Long Text. I believe it is available from 4.5 or 4.6.

Q13. How Do I Populate Additional Entries Directly Into The Tables? Is There Any Direct Way To Populate Fields In The Tables?

It depends on which tables you are talking about because some tables can be directly maintained in PRD. For some you have to transport it maintaining in DEV system. For example, number ranges are not transportable. You have to maintain it directly in every instance.

If you are talking about mass maintenance, Standard SAP QM does not have it by now. You can talk to your developer to write a program for you by which you can do a mass maintenance. Otherwise SM30 is good enough to run.

Q14. Can Somebody Explain To Me How A New Posting Proposal Can Be Added In Order To Use This In The Catalog Assigned To A Ud Code? There Is A New One But Won't Be Available (vmenge01) Until 200

Try the customizing path Quality Management -- > Quality Inspection --> Inspection Lot completion -- > Define inventory postings.

Q15. We Have Two Inspection Lots For Which Ud Has Already Been Done. Later On We Realized That These Lots The Sample Size Was Not Calculated. Now We Want To Reset The "sample Calculation" But Not Able As T

Under normal condition, a UD cannot be reversed.

Q16. The Deletion Flag On Production Order Was Set But Had To Be Revoked To Allow Further Goods Issues. Issues Have Now Taken Place But In Trying To Reset The Deletion Flag, The Following Error Message Occ

You're normally not allowed to mark a Production order for deletion as long as the financial value on the order isn't zero and/or you've got materials posted to it.

I can't see the point in deleting an order with postings. That way you'd probably mess up both logistics and accounting.

Q17. I Have A Requirement From A Client For Inspection Of A Material For Different Vendors. Characteristics Change From Vendor To Vendor. Automatically , The Inspection Plan Will Need To Be Selected Based

In the material to plan assignment, scroll to the right and you will see a vendor column. If you put a vendor number in that column, that is the plan that will be selected for the material/plant/vendor.

Q18. When I Try To Upload Data With Lsmw To Create Inspection Plan, The System Shows The Message: "bdc_open_group, Lock Date./. Is Invalid". I Have Bdc Authority, So What's The Problem?

Did you enter a date for field START in structure BI000? The date has to be earlier than today's date.

The queue start date specifies the day until which a batch input folder is locked. You cannot process a locked batch input folder until the day after the specified date.

Q19. I Am Doing Quality After Doing Migo Mvt Type 10

You can use the list display transaction code QE51N and in the EXCEPTION criteria you can specify it to be ‘UD Not done’.

Otherwise in the same transaction code QE51N in the output columns, you can display the column "Usage decision by" and sort by it so that the blank ones are on the top. Those blank ones are the lots for which UD was not done. Once you find out the lot numbers you can open the lot and see the order number in it.

Q20. I Need To Change The Status Of A Lot Based On Certain Conditions And Looked At Qfpo_post_status_for_lot But This Didn't Return Anything. I Need The Status Of The Lot To Be Insp Rrec So That I Can For

In general, forcing a change to the system status is not a very good idea. Instead, you should consider using a user status. If the system status is not RREC then, there will be no results to copy.

Q21. I Would Like To Know Where The Batch Status Can Be Set In Sap. We Have The Stock Type Q For Quality Inspection. We Would Like Stock Type R For Rework And S For Blocked. Where Can This Be Set In Sap?

There is no way to create a new status. The only thing you can do, if you have Batch Management, is to activate the Batch status so you can have Unrestricted (blank), Quality (Q) and Blocked (S). Having these batch statuses, you can duplicate all stocks to restricted Q, blank and S.

Q22. In Our Plant, Gr For A Material Was Made Three Months Back. This Material Is Qm Managed. The Quality Plan For This Material Was Made This Month Only. Hence Our Qm Personnel Are Not Able To Clear This

You can reset the Sample Calculation and Recalculate the change in Start & Inspection end date in QA02.

In QA02 you can also change the key date on the second tab so it looks for a plan on that date. If that plan has already been created, you can then change the key date to the current date and it will find the plan.

Q23. Is There A Way To Create Inspection Lot Programmatically In An Abap Report? Is There Any Business Object, Function Module Or User Exit? We Went To 1 Lot For 1 Shift. We Use Inspection Origin 89 (manua

Automatic creation of Inspection lot in SAP is governed by Inspection lot origin, inspection type, etc.

You have to give the details of why you want an inspection lot creation by program or ABAP report.

Instead, you can use a report /program to do it. Standard SAP provides this functionality.

If it is in--process inspection, you can use inspection points based on shifts.

Q24. I Was In The Process Of Testing The Scenario Of Skip Lots. I Have Done All The Data Maintenance In The Material Master And The Dynamic Modification Rule. The Quality Level Is Getting Updated To A Skip

This can be done by setting the Control Inspection lot indicator in the QM view of the material master to each material document.

Iit works for DMR at a lot and characteristic level.

Q25. While Rr For Some Of The Mic's, The System Is Asking For Manual Valuation And For Some It Is Not Asking. I Want The System To Ask Manual Valuation For All The Mic's. What Settings Should I Do To Get T

Check your Valuation Mode / Sampling Procedure. From there, you can find the settings needed to configure your requirement.

Q26. I Could Not Create Return Delivery For A Material. The Message Display Is:
'could Not Create Return Delivery Wm Movement Type 102 Not Allowed For Warehouse No. 010'. How Do I Fix This Problem?

Check in the configuration. The message clearly says that for the Warehouse no. 010 you have not allowed movement type "102".

You have to change this configuration and add a line or move the stock to a warehouse where customer returns are allowed.

Q27. How Do I Transfer The Results From One Origin To Another Origin?

This can be done by creating a program attached to the follow up functions for the UD code. Once the UD is done the results can be transferred from lot to lot

Q28. I Am Using Exit Mm06l001 (function Module- Exit_sapmm06l_001) For Quality Criteria. The Scores Of The Sub Criteria Are Calculated On The Basis Of Quality Notifications And Inspection Lots. But No Scor

Regarding quality notification, do verify the following:

  1. Notification completed with External origin.
  2. Invoice verification already took place.

As for inspection lot, verify that usage decision has been made. In addition, verify customization of all required parameters (as listed in documentation under QM->Quality Control->Vendor Evaluation).

Q29. I Have Executed Massive Automatic Usage Decision Via Qa16 And Noticed That No Stock Postings Been Updated. The System Noted The Usage Decision But Didn't Carry Any Goods Movements. Why Were The Stock

You should make sure that the UD codes you use have the automatic postings setup for it. The selected set code needs to be set for background postings and what material status it should post to. Take care of these and it will take care of the problems.

Q30. Is It Possible To Cancel The Inspection Lot Once It Has Been Created?

You can cancel it by reversing the transaction that created it.

It's also possible to go into the inspection lot in Chance mode and set the status to “locked”. It will then disappear, but if there's QI stock linked to it you won't get it out.