Top 8 Estimation Techniques Interview Questions You Must Prepare 19.Mar.2024

“Estimation is the process of finding an estimate, or approximation, which is a value that is usable for some purpose even if input data may be incomplete, uncertain, or unstable.

Three point estimation is the estimation method is based on statistical data. It is very much similar to WBS technique, task are broken down into subtasks & three types of estimation are done on this sub pieces.

Optimistic Estimate (Best case scenario in which nothing goes wrong and all conditions are optimal.) = A

Most Likely Estimate (most likely duration and there may be some problem but most of the things will go right.) = M

Pessimistic Estimate (worst case scenario which everything goes wrong.) = B

Formula to find Value for Estimate (E) = A + (4*M) + B / 6

Standard Deviation (SD) = = (B – A)/6

Now a days, planning poker and Delphi estimates are most popular testing test estimation techniques.

Functional Point is measured from a functional, or user, point of view.It is independent of computer language, capability, technology or development methodology of the team. It is based on available documents like SRS, Design etc.

In this FP technique we have to give weightage to each functional point. Prior to start actual estimating tasks functional points are divided into three groups like Complex, Medium & Simple. Based on similar projects & Organization standards we have to define estimate per function points. 

Total Effort Estimate = Total Function Points * Estimate defined per Functional Point

Test Estimation is a management activity which approximates how long a Task would take to complete. Estimating effort for the test is one of the major and important tasks in Test Management.

Delphi technique – This is one of the widely used software testing estimation technique.

In the Delphi Method is based on surveys and basically collects the information from participants who are experts. In this estimation technique each task is assigned to each team member & over multiple rounds surveys are conduct unless & until a final estimation of task is not finalized. In each round the thought about task are gathered & feedback is provided. By using this method, you can get quantitative and qualitative results.

In overall techniques this technique gives good confidence in the estimation. This technique can be used with the combination of the other techniques.

There are different Software Testing Estimation Techniques which can be used for estimating a task.

  1. Delphi Technique
  2. Work Breakdown Structure (WBS)
  3. Three Point Estimation
  4. Functional Point Method

List of Software Test Estimation Techniques:

  • Work Breakdown Structure
  • 3-Point Software Testing Estimation Technique
  • Wideband Delphi technique
  • Function Point/Testing Point Analysis
  • Use – Case Point Method
  • Percentage distribution
  • Ad-hoc method

  • A big project is made manageable by first breaking it down into individual components in a hierarchical structure, known as the Work breakdown structure, or the WBS.
  • The WBS helps to project manager and the team to create the task scheduling, detailed cost estimation of the project. By using the WBS motions, the project manager and team will have a pretty good idea whether or not they’ve captured all the necessary tasks, based on the project requirements, which are going to need to happen to get the job done.
  • In this technique the complex project is divided into smaller pieces. The modules are divided into smaller sub-modules. Each sub-modules are further divided into functionality. And each functionality can be divided into sub-functionalities. After breakdown  the work all functionality should review to check whether each & every functionality is covered in the WBS.
  • Using this you can easily figure out the what all task needs to completed & they are breakdown into details task so estimation to details task would be more easier than estimating overall Complex project at one shot.

Work Breakdown Structure has four key benefits:

  • Work Breakdown Structure forces the team to create detailed steps: In The WBS all steps required to build or deliver the service are divided into detailed task by Project manager, Team and customer. It helps to raise the critical issues early on, narrow down the scope of the project and create a dialogue which will help make clear bring out assumptions, ambiguities, narrow the scope of the project, and raise critical issues early on.
  •  Work Breakdown Structure help to improve the schedule and budget: WBS enables you to make an effective schedule and good budget pl. As all tasks are already available so it helps in generating a meaningful schedule and makes scheming a reliable budget easier.
  • Work Breakdown Structure creates accountability: The level of details task breakdown helps to assign particular module task to individual, which makes easier to hold person accountable to complete the task. Also the detailed task in WBS, people cannot allow hiding under the “cover of broadness.”
  • Work Breakdown Structure creation breeds commitment: The process of developing and completing a WBS breed excitement and commitment. Although the project manager will often develop the high-level WBS, he will seek the participation of his core team to flesh out the extreme detail of the WBS. This participation will spark involvement in the project.